![用于低位顶升模架体系的挂架系统快速安装施工方法](/CN/2016/1/126/images/201610632607.jpg)
基本信息:
- 专利标题: 用于低位顶升模架体系的挂架系统快速安装施工方法
- 专利标题(英):Quick mounting construction method for hanging frame system used for low jacking mould frame system
- 申请号:CN201610632607.0 申请日:2016-08-04
- 公开(公告)号:CN106065712A 公开(公告)日:2016-11-02
- 发明人: 赵飞 , 廖峰 , 汪小东 , 寇广辉 , 余祥
- 申请人: 中建三局第一建设工程有限责任公司
- 申请人地址: 湖北省武汉市东西湖区东吴大道特1号
- 专利权人: 中建三局第一建设工程有限责任公司
- 当前专利权人: 中建三局第一建设工程有限责任公司
- 当前专利权人地址: 湖北省武汉市东西湖区东吴大道特1号
- 代理机构: 湖北武汉永嘉专利代理有限公司
- 代理人: 邬丽明
- 主分类号: E04G11/22
- IPC分类号: E04G11/22
The invention discloses a quick mounting construction method for a hanging frame system used for a low jacking mould frame system. The quick mounting construction method comprises the following steps: determining dimension of each small barrel of a structured body core barrel, determining a detail dimension of an integral hanging frame beam according to the dimension of each small barrel, and processing a hanging frame beam component required by a hanging frame; after a beret piece platform of a to-be-jacked mould system is mounted, assembling the hanging frame beam component below the beret piece platform to complete assembling of the integral hanging frame beam; arranging a power lifting device on the beret piece platform; after the integral hanging frame beam is lifted, mounting a first step of the hanging frame below the integral hanging frame beam; lifting the integral hanging frame beam to a position at a preset height from the ground, thereby completing mounting of a second step of the hanging frame, and continuously mounting the rest of the hanging frame according to the same method; lifting the integral hanging frame beam to a beret piece bottom chord, and connecting and fixing the integral hanging frame beam to the beret piece platform by utilizing a connector onto the integral hanging frame beam. According to the method disclosed by the invention, mounting time of the hanging frame system is shortened, and construction risks are reduced.
公开/授权文献:
- CN106065712B 用于低位顶升模架体系的挂架系统快速安装施工方法 公开/授权日:2017-10-17
IPC结构图谱:
E | 固定建筑物 |
--E04 | 建筑物 |
----E04G | 脚手架、模壳;模板;施工用具或其他建筑辅助设备,或其应用;建筑材料的现场处理;原有建筑物的修理,拆除或其他工作 |
------E04G11/00 | 用以制作墙、楼板、顶棚或屋顶用的模壳,模板或工作架 |
--------E04G11/06 | .用于墙体的,例如,弧形墙 |
----------E04G11/08 | ..混凝土凝固后全部拆除,待下次浇灌时再重新拼装的模壳 |
------------E04G11/22 | ...连续地或逐段地提升并在提升过程中与已浇灌的混凝土相接触的滑动模壳;所用的提升设备的设置 |