
基本信息:
- 专利标题: 一种地铁隧道工程中土压平衡盾构建压始发的施工方法
- 专利标题(英):Construction method for earth pressure balance shield construction pressure launching in subway tunnel engineering
- 申请号:CN201610236565.9 申请日:2016-04-15
- 公开(公告)号:CN105822312A 公开(公告)日:2016-08-03
- 发明人: 胡长明 , 张延杰 , 刘政 , 张珊珊 , 叶正武 , 袁一力
- 申请人: 西安建筑科技大学
- 申请人地址: 陕西省西安市雁塔路13号
- 专利权人: 西安建筑科技大学
- 当前专利权人: 西安建筑科技大学
- 当前专利权人地址: 陕西省西安市雁塔路13号
- 代理机构: 西安恒泰知识产权代理事务所
- 代理人: 李婷
- 主分类号: E21D9/06
- IPC分类号: E21D9/06
The invention provides a construction method for earth pressure balance shield construction pressure launching in subway tunnel engineering. According to the method, a tunnel portal extending ring is matched with rubberized cord fabric, a folding pressure plate and a spring steel plate dual-sealing device to maintain pressure, and replacement is carried out on in-bin residue earth of a launching ring during trial boring launching. According to the method, pressure can be built quickly and normally to reach earth pressure balance tunneling requirements by replacing the in-bin residue earth of the launching ring when the launching ring excavates during the shield launching, water burst risk and sand burst risk generated by directly breaking a tunnel portal are avoided, the construction period is shortened and the construction cost is reduced. According to the shield tunnel construction pressure launching construction method, the risk increased by directly breaking the tunnel portal can be avoided, the leakproofness of the tunnel portal can be ensured, construction pressure excavation can be quickly realized, cost is saved, and the construction safety of the shield tunnel can be guaranteed.
公开/授权文献:
- CN105822312B 一种地铁隧道工程中土压平衡盾构建压始发的施工方法 公开/授权日:2018-10-09
IPC结构图谱:
E | 固定建筑物 |
--E21 | 土层或岩石的钻进;采矿 |
----E21D | 竖井;隧道;平硐;地下室 |
------E21D9/00 | 衬砌或不衬砌的隧道或平硐;其掘进的方法或设备;隧道、平硐的设计布置 |
--------E21D9/06 | .通过使用掘进护板 |