基本信息:
- 专利标题: 斜拉桥的调索方法及使用该方法的调索系统
- 专利标题(英):Cable-stayed bridge cable adjusting method and cable adjusting system adopting cable adjusting method
- 申请号:CN201610027780.8 申请日:2016-01-04
- 公开(公告)号:CN105672132A 公开(公告)日:2016-06-15
- 发明人: 梁晓东 , 谢鸿 , 易诞 , 陈胜吉 , 李君
- 申请人: 湖南联智桥隧技术有限公司
- 申请人地址: 湖南省长沙市望城经开区沿河路
- 专利权人: 湖南联智桥隧技术有限公司
- 当前专利权人: 湖南联智桥隧技术有限公司
- 当前专利权人地址: 湖南省长沙市望城经开区沿河路
- 代理机构: 长沙七合源专利代理事务所
- 代理人: 欧颖; 吴婷
- 主分类号: E01D21/00
- IPC分类号: E01D21/00 ; E01D19/16
The invention provides a cable-stayed bridge cable adjusting method and a cable adjusting system adopting the cable adjusting method. The cable-stayed bridge cable adjusting method includes the following steps that S1, after primary tensioning of inhaul cables and bridge deck system construction are completed, the inhaul cables of a bridge are divided into regions and numbered towards the two ends of the bridge with a cable tower as the center, the inhaul cables located at the two sides of the cable tower in the length direction of the bridge are arranged in each region, and the numbers of the inhaul cables at the two sides are equal; S2, an intelligent tensioning jack connected with a control center is mounted on each inhaul cable of the first region; S3, overall cable force adjustment is carried out on all the inhaul cables of the first region; S4, cable force of all the inhaul cables is finely adjusted according to displayed cable force of all the inhaul cables of the first region and designed target values, so that the cable force is made to reach a design goal; S5, the step S2, the step S3 and the step S4 are repeated, so that the inhaul cables of all the divided regions are sequentially adjusted until cable adjustment of the last region is completed; and S6, all the intelligent tensioning jacks are dismantled, and inhaul cable adjustment of the whole bridge is completed. The cable adjusting method and system are high in efficiency and reduce cost, and operation is convenient.
IPC结构图谱:
E | 固定建筑物 |
--E01 | 道路、铁路或桥梁的建筑 |
----E01D | 桥梁 |
------E01D19/00 | 桥梁结构建筑细部 |
--------E01D21/00 | .专用于架设或装配桥梁的方法或设备 |