- 专利标题: 适用于潟湖相岛礁环境下的组合基础结构及其施工方法
- 专利标题(英):Combined foundation structure suitable for lagoon face island-reef environment and construction method thereof
- 申请号:CN201510923816.6 申请日:2015-12-14
- 公开(公告)号:CN105544597A 公开(公告)日:2016-05-04
- 发明人: 褚文涛 , 安群慧 , 罗晓甜 , 潘东发 , 秦顺全 , 吴方明 , 杨帆 , 张卫红 , 冉军林
- 申请人: 中铁大桥局集团有限公司
- 申请人地址: 湖北省武汉市汉阳区汉阳大道38号
- 专利权人: 中铁大桥局集团有限公司
- 当前专利权人: 中铁大桥局集团有限公司
- 当前专利权人地址: 湖北省武汉市汉阳区汉阳大道38号
- 代理机构: 北京捷诚信通专利事务所
- 代理人: 王卫东
- 主分类号: E02D27/52
- IPC分类号: E02D27/52 ; E02D23/02 ; E02D19/18 ; E02D5/24
The invention discloses a combined foundation structure suitable for a lagoon face island-reef environment and a construction method thereof, and relates to the field of geotechnical designs and island-reef development. The combined foundation structure suitable for the lagoon face island-reef environment and the construction method thereof are suitable for coral lagoon geological conditions. The combined foundation structure suitable for the lagoon face island-reef environment comprises high-pressure jet grouting stabilization piles, a prefabricated caisson, lateral restraining high-pressure jet grouting piles, prefabricated bored sinking pipe piles and a prefabricated bearing platform, wherein the prefabricated caisson is located on the high-pressure jet grouting stabilization piles and in a curtain structure formed by the lateral restraining high-pressure jet grouting piles and is in rigid connection with the prefabricated bearing platform into a whole for collaborative bearing through the prefabricated bored sinking pipe piles. The combined foundation structure suitable for the lagoon face island-reef environment and the construction method thereof not only overcome the disadvantageous engineering characteristics of a coral lagoon foundation structure such as high structural performance, low bearing capacity and large deformation, but also bring the bearing capacity of each layer of rock and earth mass of the coral lagoon foundation structure into full play, have the characteristics of large rigidity, high bearing capacity and fast, excellent and economical construction and the like, have the advantage of adapting to construction in island areas, have broad application prospects, and make it possible to build an airport and other overhead reclamation engineering on a coral lagoon foundation.