基本信息:
- 专利标题: 多层施工吊篮
- 申请号:CN201610019015.1 申请日:2016-01-13
- 公开(公告)号:CN105464358B 公开(公告)日:2018-02-27
- 发明人: 李新明 , 才永发 , 李艳阳 , 郭艳召 , 李银焜 , 曾庆平 , 刘二虎 , 张慧 , 熊建武 , 胡方华 , 黎学皓
- 申请人: 中国葛洲坝集团第一工程有限公司
- 申请人地址: 湖北省宜昌市东山大道54号葛洲坝一公司
- 专利权人: 中国葛洲坝集团第一工程有限公司
- 当前专利权人: 中国葛洲坝集团第一工程有限公司
- 当前专利权人地址: 湖北省宜昌市东山大道54号葛洲坝一公司
- 代理机构: 宜昌市慧宜专利商标代理事务所
- 代理人: 彭娅
- 主分类号: E04G3/30
- IPC分类号: E04G3/30
The invention provides a multi-layer construction basket. The multi-layer construction basket comprises a support, at least two layers of work platforms are arranged on the support, a work ladder is arranged between the work platforms, and abutting-against wheels used for sliding along a building are arranged on the back face of the support. Telescopic work platforms movably connected with the work platforms are arranged at the two ends of the work platforms and used for stretching into gate slots to conduct construction. The construction scheme that multiple overhanging scaffolds are set up in the construction gate slots to serve as an operation platform in the prior art is replaced by the basket structure provided with the multiple layers of work platforms, labor and material cost for constructing the overhanging scaffolds is reduced, potential safety hazards caused by vertical cross operation are eliminated, the construction efficiency of a gate slot technical structure and civil engineering is improved, dam concrete is poured to the top in advance, and the construction period of the dam major engineering is shortened.
公开/授权文献:
- CN105464358A 多层施工吊篮 公开/授权日:2016-04-06