
基本信息:
- 专利标题: 一种基于用电舒适度的空调负荷优先级中断方法
- 申请号:CN201510641078.6 申请日:2015-09-30
- 公开(公告)号:CN105444343B 公开(公告)日:2020-03-13
- 发明人: 颜庆国 , 杨斌 , 陈楚 , 肖文举 , 薛璐 , 鲜景润 , 胡佳琪 , 阮文俊 , 张昊纬 , 肖宇华
- 申请人: 江苏省电力公司南京供电公司 , 北京慧和仕科技有限责任公司 , 国家电网公司 , 江苏省电力公司
- 申请人地址: 江苏省南京市奥体大街1号
- 专利权人: 江苏省电力公司南京供电公司,北京慧和仕科技有限责任公司,国家电网公司,江苏省电力公司
- 当前专利权人: 江苏省电力公司南京供电公司,北京慧和仕科技有限责任公司,国家电网公司,江苏省电力公司
- 当前专利权人地址: 江苏省南京市奥体大街1号
- 代理机构: 南京天翼专利代理有限责任公司
- 代理人: 王玉梅
- 主分类号: F24F11/61
- IPC分类号: F24F11/61 ; F24F11/64 ; F24F11/70 ; F24F110/10 ; F24F110/12 ; F24F140/50
The invention relates to an air conditioner load priority interruption method based on the electricity utilization comfort level. The air conditioner load priority interruption method comprises the following steps that (1) an air conditioner response time interval and control time interval length are determined, air conditioner load peak clipping total amount in the response time interval is determined, and on-off states of all air conditioners and indoor temperature data in a control time interval are collected; (2) temperature set values and floating ranges of all the air conditioners are determined; (3) electricity utilization comfort level indexes of air conditioner load and corresponding air conditioner load control models are established; (4) the air conditioner electricity utilization comfort level indexes and corresponding air conditioner load states are worked out according to the actual data; and (5) all the comfort level indexes are ranked by magnitude, and a final air conditioner interruption scheme is determined with combination of the air conditioner load peak clipping total amount. The air conditioner load priority interruption method based on calculation of the electricity utilization comfort level indexes has feasibility and effectiveness; concrete reference schemes are provided for air conditioner load participating peak clipping during application; the optimization effect of the electricity utilization comfort level is ensured to the greatest extent while the requirement for power grid peak clipping is met.
公开/授权文献:
- CN105444343A 一种基于用电舒适度的空调负荷优先级中断方法 公开/授权日:2016-03-30
IPC结构图谱:
F | 机械工程;照明;加热;武器;爆破 |
--F24 | 供热;炉灶;通风 |
----F24F | 空气调节;通风 |
------F24F11/00 | 控制系统或设备;安全系统或设备 |
--------F24F11/30 | .与系统运行目的相关,例如,为了安全或监控 |
----------F24F11/61 | ..使用计时器 |