![桩顶支撑步履式移动打桩平台](/CN/2015/1/171/images/201510856316.jpg)
基本信息:
- 专利标题: 桩顶支撑步履式移动打桩平台
- 专利标题(英):Pile top supporting walking type moving piling platform
- 申请号:CN201510856316.5 申请日:2015-11-27
- 公开(公告)号:CN105421454A 公开(公告)日:2016-03-23
- 发明人: 张鸿 , 谢道平 , 汪文霞 , 郭强 , 薛志武 , 封有德 , 茅兵海 , 冯先导 , 张晓平 , 侯晓勤 , 刘益平 , 张梦元 , 李曾曾
- 申请人: 中交第二航务工程局有限公司 , 中交武汉港湾工程设计研究院有限公司
- 申请人地址: 湖北省武汉市东西湖区金银湖路11号
- 专利权人: 中交第二航务工程局有限公司,中交武汉港湾工程设计研究院有限公司
- 当前专利权人: 中交第二航务工程局有限公司,中交武汉港湾工程设计研究院有限公司
- 当前专利权人地址: 湖北省武汉市东西湖区金银湖路11号
- 代理机构: 武汉开元知识产权代理有限公司
- 代理人: 俞鸿
- 主分类号: E02D7/14
- IPC分类号: E02D7/14 ; E02D7/16
The invention discloses a pile top supporting walking type moving piling platform which comprises a pile top ejecting and positioning device fixed to the top of a steel pipe pile. A bearing platform is fixed to the pile top ejecting and positioning device. An operation platform is fixed to the bearing platform. A large bent frame guide frame is fixed to the front part of the operation platform. Two small bent frame guide frames are fixed to the left side and the right side of the bearing platform respectively. Installation platforms are fixed to the positions, corresponding to the steel pipe pile, of the front side and the rear side of the bearing platform. Walking-type ejecting forward moving of the pile top supporting walking type moving piling platform is achieved through a three-directional jack of the pile top ejecting and positioning device. The steel pipe pile can be quickly and accurately positioned through the cooperative work of a lifting adjusting device, the three-dimensional jack, the large bent frame guide frame and the small bent frame guide frames, construction of the steel pipe pile in the whole platform range can be achieved through transverse moving of the guide frames, and assembling and disassembling of the pile top ejecting and positioning device and subsequent pile top construction can be quickly achieved through the installation platforms.
公开/授权文献:
- CN105421454B 桩顶支撑步履式移动打桩平台 公开/授权日:2017-08-25
IPC结构图谱:
E | 固定建筑物 |
--E02 | 水利工程;基础;疏浚 |
----E02D | 基础;挖方;填方;地下或水下结构物 |
------E02D7/00 | 放置板桩壁、桩、管形模或其他模的方法或设备 |
--------E02D7/02 | .用击打法设置 |
----------E02D7/06 | ..动力打桩机 |
------------E02D7/14 | ...打桩机的部件 |