基本信息:
- 专利标题: 长周期存放煤堆热值测定煤样预埋装置
- 专利标题(英):Long-period-storage coal pile heat value measurement coal sample pre-embedding device
- 申请号:CN201510975270.9 申请日:2015-12-22
- 公开(公告)号:CN105403446A 公开(公告)日:2016-03-16
- 发明人: 刘国忠 , 唐忠 , 柏荣 , 叶正亮 , 王智强 , 冯颖 , 马忠斌 , 王巍 , 江维 , 杜云峰 , 蒋建军 , 王鲁杰 , 郝建国 , 梅勇
- 申请人: 中煤科工集团重庆研究院有限公司 , 神华四川能源有限公司江油发电厂 , 中国电力工程顾问集团西南电力设计院有限公司
- 申请人地址: 重庆市九龙坡区二郎科城路6号
- 专利权人: 中煤科工集团重庆研究院有限公司,神华四川能源有限公司江油发电厂,中国电力工程顾问集团西南电力设计院有限公司
- 当前专利权人: 中煤科工集团重庆研究院有限公司,神华四川能源有限公司江油发电厂,中国电力工程顾问集团西南电力设计院有限公司
- 当前专利权人地址: 重庆市九龙坡区二郎科城路6号
- 代理机构: 北京同恒源知识产权代理有限公司
- 代理人: 廖曦
- 主分类号: G01N1/36
- IPC分类号: G01N1/36
The present invention relates to a long-period-storage coal pile heat value measurement coal sample pre-embedding device belonging to the technical field of coal pile heat value measurement. The long-period-storage coal pile heat value measurement coal sample pre-embedding device includes an outer drilling protective casing and an internal coal sample storage unit; the outer drilling protective casing includes a drilling circular pipe, a front end cone tip, pipe wall circular holes and a drilling handle; the front end pipe wall of the drilling circular pipe is provided with the plurality of pipe wall circular holes, the front end cone tip is installed on the top of the circular pipe, and is used for reducing resistance during a drilling process; the rear end of the drilling circular pipe is provided with the drilling handle; the internal coal sample storage unit includes U-shaped channel steel, coal sample storage cells, strip-shaped cover plates, nuts, coal sample storage cell surface circular holes and partitions; the front end of the U-shaped channel steel is provided with the plurality of coal sample storage cells, the coal sample storage cells are separated by the partition, the upper parts of the coal sample storage cells are covered with the strip-shaped cover plates, and bolted. The device can reduce the sampling error to the greatest degree, reduces the number of times of sub-sample collection, and can make a test task simple.
公开/授权文献:
- CN105403446B 长周期存放煤堆热值测定煤样预埋装置 公开/授权日:2018-02-13
IPC结构图谱:
G | 物理 |
--G01 | 测量;测试 |
----G01N | 借助于测定材料的化学或物理性质来测试或分析材料 |
------G01N1/00 | 取样;制备测试用的样品 |
--------G01N1/02 | .取样装置 |
----------G01N1/36 | ..样品的放入或类似的安装 |