- 专利标题: 一种超大直径工程桩的钢筋笼及其施工方法
- 专利标题(英):Steel reinforcement cage of oversized-diameter engineering pile and construction method of steel reinforcement cage
- 申请号:CN201510676141.X 申请日:2015-10-19
- 公开(公告)号:CN105239560A 公开(公告)日:2016-01-13
- 发明人: 周予启 , 黄勇 , 左强 , 薛刚 , 李彦贺 , 魏健 , 王鸿章 , 任耀辉 , 李鹏 , 史春芳
- 申请人: 中建一局集团建设发展有限公司 , 中国建筑一局(集团)有限公司
- 申请人地址: 北京市朝阳区望花路西里17号楼
- 专利权人: 中建一局集团建设发展有限公司,中国建筑一局(集团)有限公司
- 当前专利权人: 中建一局集团建设发展有限公司,中国建筑一局(集团)有限公司
- 当前专利权人地址: 北京市朝阳区望花路西里17号楼
- 代理机构: 北京中建联合知识产权代理事务所
- 代理人: 宋元松
- 主分类号: E02D5/34
- IPC分类号: E02D5/34
The invention provides a steel reinforcement cage of an oversized-diameter engineering pile and a construction method of the steel reinforcement cage. The steel reinforcement cage comprises a first longitudinal bar layer, a second longitudinal bar layer and an inner longitudinal bar ring. The first longitudinal bar layer is located on the outmost layer, attached to the inner wall of a hole and formed by arranging a plurality of steel bars in the longitudinal direction at intervals to form a circle. The second longitudinal bar layer is close to the inner surface of the first longitudinal bar layer and is formed by arranging a plurality of steel bars in the longitudinal direction at intervals to form a circle. The inner longitudinal bar ring is arranged in the second longitudinal bar layer and formed by arranging a plurality of steel bars in the longitudinal direction at intervals to form a circle, and the radius of the inner longitudinal bar ring is half that of the first longitudinal bar layer. The first longitudinal bar layer and the second longitudinal bar layer are fixed by inner stirrups and outer stirrups, and the structure is stable; the inner longitudinal bar ring is provided with fixing inner ring welding bars and locating inner ring steel bar fixing bars, and deflection of the inner longitudinal bar ring is avoided; and the whole steel reinforcement cage can completely adapt to application of the oversized-diameter engineering pile. According to the construction method, the whole steel reinforcement cage is built step by step from outside to inside and from bottom to top, the building efficiency is improved, and meanwhile the construction safety of construction personnel is guaranteed.
公开/授权文献:
- CN105239560B 一种超大直径工程桩的钢筋笼的施工方法 公开/授权日:2017-03-22