![现场观测季节性冻土区高速铁路土层冻胀的方法及装置](/CN/2015/1/34/images/201510174071.jpg)
基本信息:
- 专利标题: 现场观测季节性冻土区高速铁路土层冻胀的方法及装置
- 专利标题(英):Method and device for field observation of soil layer frost heaving of high speed railway in seasonal frozen soil region
- 申请号:CN201510174071.8 申请日:2015-04-14
- 公开(公告)号:CN104929098A 公开(公告)日:2015-09-23
- 发明人: 曹立 , 曹元平 , 李成 , 余洁 , 高志伟 , 王向阳 , 舒磊 , 姚宏乐 , 王应铭 , 杨西峰 , 田志军 , 张然
- 申请人: 中铁第一勘察设计院集团有限公司
- 申请人地址: 陕西省西安市西影路二号
- 专利权人: 中铁第一勘察设计院集团有限公司
- 当前专利权人: 中铁第一勘察设计院集团有限公司
- 当前专利权人地址: 陕西省西安市西影路二号
- 代理机构: 西安新思维专利商标事务所有限公司
- 代理人: 李罡
- 主分类号: E02D1/00
- IPC分类号: E02D1/00
The invention relates to a method and device for field observation of soil layer frost heaving of a high speed railway in a seasonal frozen soil region. An optical instrument used for observing seasonal frozen soil layer frost heaving amount cannot be used for observing the frost heaving amount of all layered soil in the freezing depth, precision is hard to meet, and professional instruments and observation technicians are needed for observation. The device is buried in a seasonal frozen soil layer and comprises a round-sheet-shaped lower anchor disc and a round-sheet-shaped upper anchor disc. A vertical measuring bar displacement meter is connected to the center of the lower anchor disc and the center of the upper anchor disc, and the measuring bar displacement meter is connected with a reading instrument arranged outside filled soil above the upper anchor disc through a transmission cable. Frost heaving deformation of the seasonal frozen soil layer drives the upper anchor disc and the lower anchor disc to move, and the measuring bar displacement meter is used for observing the variable quantity of the distance between the upper anchor disc and the lower anchor disc to reflect the frost heaving amount of the seasonal frozen soil layer. By means of the method and device, the total frost heaving amount of the seasonal frozen soil layer can be observed, and the frost heaving amount of all layered soil can be observed by setting devices of different lengths; the displacement meter is high in observation precision and efficiency, and automation of observation of frost heaving deformation can be achieved.
公开/授权文献:
- CN104929098B 现场观测季节性冻土区高速铁路土层冻胀的方法及装置 公开/授权日:2016-08-24
IPC结构图谱:
E | 固定建筑物 |
--E02 | 水利工程;基础;疏浚 |
----E02D | 基础;挖方;填方;地下或水下结构物 |
------E02D1/00 | 现场基础土壤的勘测 |