![挤入式扩底型管桩施工工艺](/CN/2015/1/10/images/201510054942.jpg)
基本信息:
- 专利标题: 挤入式扩底型管桩施工工艺
- 专利标题(英):Construction technology of squeeze-in expanded-base pipe pile
- 申请号:CN201510054942.2 申请日:2015-02-02
- 公开(公告)号:CN104727309A 公开(公告)日:2015-06-24
- 发明人: 石艺 , 夏建国 , 余铁稳 , 艾传井 , 杨俊波 , 金勤胜 , 李智 , 刘江
- 申请人: 中国电力工程顾问集团中南电力设计院有限公司
- 申请人地址: 湖北省武汉市武昌区中南二路12号
- 专利权人: 中国电力工程顾问集团中南电力设计院有限公司
- 当前专利权人: 中国电力工程顾问集团中南电力设计院有限公司
- 当前专利权人地址: 湖北省武汉市武昌区中南二路12号
- 代理机构: 武汉开元知识产权代理有限公司
- 代理人: 陈家安
- 主分类号: E02D5/44
- IPC分类号: E02D5/44 ; E02D15/04
The invention discloses a construction technology of a squeeze-in expanded-base pipe pile and relates to a construction technology of a pile foundation. The construction technology includes the steps that first-time static pressure or hammering construction is performed on a pile body according to a normal process, piling is performed till the pile body reaches designed elevation, and then, a mandrel is inserted in the pile body; second-time piling or static pressure is performed on the pile body so that the bottom pile tip and the pile body can be separated from each other and downward expanding can be performed. After downward expanding is completed, an appropriate amount of concrete with expanding agents is poured into the pile body, the mandrel is inserted in the pile body again, and third-time piling or static pressure is performed on the pile body so that the concrete can be squeezed out of the bottom of the pile body and an expanded head can be formed. Through the construction technology, the poured expanded head has high compression bearing capacity and high uplift bearing capacity. Meanwhile, the concrete is poured after hammering or static pressure downward expanding, finally, squeezing is performed, and therefore the pile type is better in applicability, and the pile is applicable to a soft soil area and is also applicable to a hard soil layer area.
IPC结构图谱:
E | 固定建筑物 |
--E02 | 水利工程;基础;疏浚 |
----E02D | 基础;挖方;填方;地下或水下结构物 |
------E02D5/00 | 基础工程专用的板桩墙,桩或其他结构构件 |
--------E02D5/22 | .桩 |
----------E02D5/24 | ..预制桩 |
------------E02D5/38 | ...用管形模或其他模子筑桩 |
--------------E02D5/44 | ....在桩的底部有扩大头或扩大部分 |