基本信息:
- 专利标题: 错缝矩形盾构的封顶管片及立柱管片的拼装结构及方法
- 专利标题(英):Rectangular staggered joint shield based capping segment and post segment assembling structure and method
- 申请号:CN201410837634.2 申请日:2014-12-28
- 公开(公告)号:CN104695976A 公开(公告)日:2015-06-10
- 发明人: 朱雁飞 , 李刚 , 黄德中 , 王旋东 , 黄俊 , 范杰 , 刘喜东 , 陈培新
- 申请人: 上海隧道工程股份有限公司 , 上海隧道工程有限公司 , 上海隧道盾构工程有限公司
- 申请人地址: 上海市徐汇区宛平南路1099号5楼
- 专利权人: 上海隧道工程股份有限公司,上海隧道工程有限公司,上海隧道盾构工程有限公司
- 当前专利权人: 上海隧道工程有限公司,宁波市轨道交通集团有限公司,上海隧道盾构工程有限公司
- 当前专利权人地址: 上海市徐汇区宛平南路1099号5楼
- 代理机构: 上海唯源专利代理有限公司
- 代理人: 曾耀先
- 主分类号: E21D11/08
- IPC分类号: E21D11/08
The invention discloses a rectangular staggered joint shield based capping segment and post segment assembling structure and method. The method comprises steps as follows: lower T-shaped segments at the bottom of assembling space as well as left waist segments and right waist segments located on two sides of each lower T-shaped segment respectively are assembled; a first assembling zone is reserved at the top of the assembling space; a second assembling zone is reserved on the left side or the right side of the top of the assembling space; upper T-shaped segments are assembled in the first assembling zone; capping segments are assembled in the second assembling zone; post segments are assembled between the upper T-shaped segments and the lower T-shaped segments. The upper T-shaped segments, the capping segments and the post segments are sequentially mounted, and the capping segments and the abutted waist segments are not staggered, the ring height difference between adjacent rings and an assembling gap between the adjacent segments are effectively controlled, the problem that the capping segments cannot be inserted into the gaps is solved, a gap between the upper and lower T-shaped segments is easier to control, and the longitudinal insertion stability of the middle post segments is high.
公开/授权文献:
- CN104695976B 错缝矩形盾构的封顶管片及立柱管片的拼装结构及方法 公开/授权日:2017-07-28
IPC结构图谱:
E | 固定建筑物 |
--E21 | 土层或岩石的钻进;采矿 |
----E21D | 竖井;隧道;平硐;地下室 |
------E21D11/00 | 隧道、平硐或其他地下洞室,例如,地下大型硐室的衬砌;其衬砌物;现场制衬砌物,例如,通过组装 |
--------E21D11/02 | .主要用木材的衬砌 |
----------E21D11/08 | ..用预制混凝土板 |