- 专利标题: 一种有关水中钢管桩建立平台的一体化施工方法
- 申请号:CN201410777966.6 申请日:2014-12-15
- 公开(公告)号:CN104612120B 公开(公告)日:2016-08-17
- 发明人: 尹跃国 , 吴红兵 , 邓永驰 , 王靖 , 孙维轩 , 程士洋
- 申请人: 中铁上海工程局集团有限公司 , 中铁上海工程局集团市政工程有限公司
- 申请人地址: 上海市闸北区江场三路278号
- 专利权人: 中铁上海工程局集团有限公司,中铁上海工程局集团市政工程有限公司
- 当前专利权人: 中铁上海工程局集团有限公司,中铁市政环境建设有限公司
- 当前专利权人地址: 上海市闸北区江场三路278号
- 代理机构: 上海三方专利事务所
- 代理人: 吴玮; 单大义
- 主分类号: E02B17/00
- IPC分类号: E02B17/00
The invention relates to the technical field of construction, in particular to an integrated construction method related to an in-water steel pipe pile establishing platform. According to the method, when cushion cap lower silt layer thickness reaches about 30 m, a large non-pile collar beam foundation between cushion caps and an in-water steel platform supporting system are completed by one-time construction, and the problem that during cushion cap collar beam foundation and steel platform supporting system independent construction, a steel pipe pile is inserted and stricken repeatedly, and on-water workload is high is solved. The method comprises the steps that the steel pipe pile is inserted and stricken below the cushion cap collar beam, the steel platform is established, and pile foundation construction is carried out; the steel platform supporting system on the upper portions of the cushion caps is detached, a steel cofferdam is arranged, cushion cap collar beam inner steel pipe pile spare parts are cut off, integral pile caps are cast, and the cushion cap collar beam is cast. Compared with the prior art, the integrated construction method has the advantages that integration construction is carried out under the foundation of the steel platform and the foundation of the cushion cap collar beam, steel platform materials are saved, construction cost is saved, steel pipe pile repeated using is carried out, the workload of on-water working is lowered, and the construction cycle is shortened.
公开/授权文献:
- CN104612120A 一种有关水中钢管桩建立平台的一体化施工方法 公开/授权日:2015-05-13
IPC结构图谱:
E | 固定建筑物 |
--E02 | 水利工程;基础;疏浚 |
----E02B | 水利工程 |
------E02B17/00 | 支承在桩基或类似支承物上的人工岛,例如,升降式支柱上的平台;其修建方法 |