![一种基于水火协调的安全约束发电计划制定方法](/CN/2014/1/101/images/201410509579.jpg)
基本信息:
- 专利标题: 一种基于水火协调的安全约束发电计划制定方法
- 专利标题(英):Security constraint generation schedule planning method based on water and fire coordination
- 申请号:CN201410509579.4 申请日:2014-09-28
- 公开(公告)号:CN104299072A 公开(公告)日:2015-01-21
- 发明人: 朱翊 , 丁强 , 张传成 , 韩彬 , 许丹 , 刘鹏 , 燕京华 , 崔辉 , 戴赛 , 黄国栋 , 李晓磊 , 曾莉丽 , 门德月
- 申请人: 国家电网公司 , 中国电力科学研究院 , 国网浙江省电力公司
- 申请人地址: 北京市西城区西长安街86号
- 专利权人: 国家电网公司,中国电力科学研究院,国网浙江省电力公司
- 当前专利权人: 国家电网公司,中国电力科学研究院,国网浙江省电力公司
- 当前专利权人地址: 北京市西城区西长安街86号
- 代理机构: 北京安博达知识产权代理有限公司
- 代理人: 徐国文
- 主分类号: G06Q10/06
- IPC分类号: G06Q10/06 ; G06Q50/06
The invention provides a security constraint generation schedule planning method based on water and fire coordination. The method comprises the following steps that power grid basic data are acquired, and electricity demands are determined; based on 'just, fair and open' dispatching and energy-saving dispatching, the electric quantity is balanced, and electric power is adjusted; according to the water and fire coordination constraint demand, the constraint condition of a water and fire coordination joint optimization model is determined; an optimization objective is determined; water and fire coordination joint optimization computing is carried out, and the generation schedule is determined. According to the method, based on the running and planning characteristic of a power grid including a large-scale water and electricity access dispatching mechanism, the water and electricity running and water and fire coordination optimizing characteristics are combined, the optimization objective includes the running cost of a thermal power unit and a hydropower unit and a unit output force adjusting penalty function, peak elimination and valley filling are carried out through coordination of the hydropower unit and the thermal power unit, so that the total adjusting amplitude of output force of the units in the system is reduced, and therefore power adjustment losses of the units in the system are reduced.
公开/授权文献:
- CN104299072B 一种基于水火协调的安全约束发电计划制定方法 公开/授权日:2018-12-04