
基本信息:
- 专利标题: 结合铝和铜的结构和方法
- 申请号:CN201410018354.9 申请日:2014-01-15
- 公开(公告)号:CN103920966B 公开(公告)日:2017-07-07
- 发明人: C.陈 , C.西蒙娜
- 申请人: 通用汽车环球科技运作有限责任公司 , 弗罗纽斯国际有限公司
- 申请人地址: 美国密歇根州;
- 专利权人: 通用汽车环球科技运作有限责任公司,弗罗纽斯国际有限公司
- 当前专利权人: 通用汽车环球科技运作有限责任公司,弗罗纽斯国际有限公司
- 当前专利权人地址: 美国密歇根州;
- 代理机构: 北京市柳沈律师事务所
- 代理人: 陈荃芳
- 优先权: 13/741,454 20130115 US
- 主分类号: B23K9/00
- IPC分类号: B23K9/00 ; B23K9/133 ; B23K9/23 ; B23K9/24 ; B23K103/10 ; B23K103/12
A bonded structure of aluminum and copper is formed by bonding a copper workpiece and an aluminum workpiece together along a joint via an arc welding process. The copper workpiece has a first coating, having a lower melting point than copper, applied to at least a portion of it. The first coating allows the copper workpiece to be wetted and brazed, while the aluminum workpiece is melted and fused along the joint. The arc welding process involves the cyclic alternating of a first stage, in which an electric current is supplied to a welding wire as it is moved toward the workpieces, and a second stage, in which the electric current is reduced and the welding wire is moved away from the workpieces, to generate and detach a plurality of molten droplets along the joint. Each molten droplet is formed from the welding wire in the first stage.
公开/授权文献:
- CN103920966A 结合铝和铜的结构和方法 公开/授权日:2014-07-16
IPC结构图谱:
B | 作业;运输 |
--B23 | 机床;不包含在其他类目中的金属加工 |
----B23K | 钎焊或脱焊;焊接;用钎焊或焊接方法包覆或镀敷;局部加热切割,如火焰切割;用激光束加工 |
------B23K9/00 | 电弧焊接或电弧切割 |