![根据电流相位角及幅值调整输电线路导线相序排列的方法](/CN/2014/1/4/images/201410022005.jpg)
基本信息:
- 专利标题: 根据电流相位角及幅值调整输电线路导线相序排列的方法
- 专利标题(英):Method for adjusting electric transmission line wire phase sequence arrangement according to current phase angles and amplitude values
- 申请号:CN201410022005.4 申请日:2014-01-18
- 公开(公告)号:CN103795074A 公开(公告)日:2014-05-14
- 发明人: 唐震 , 张军六 , 朱良肄 , 马振国 , 张悦 , 武春雷 , 李瑞 , 刘新元 , 郑惠萍 , 姚以沛 , 黄宗泽 , 石继勇 , 张慧兵 , 张岚 , 吕巍 , 武中 , 张友富 , 张来福 , 张健 , 刘永鑫 , 王欣伟 , 芦山 , 信可嘉
- 申请人: 国家电网公司 , 国网山西省电力公司电力科学研究院 , 国网山西省电力公司太原供电公司
- 申请人地址: 北京市西城区西长安街86号
- 专利权人: 国家电网公司,国网山西省电力公司电力科学研究院,国网山西省电力公司太原供电公司
- 当前专利权人: 国家电网公司,国网山西省电力公司电力科学研究院,国网山西省电力公司太原供电公司
- 当前专利权人地址: 北京市西城区西长安街86号
- 代理机构: 山西科贝律师事务所
- 代理人: 陈奇
- 主分类号: H02J3/26
- IPC分类号: H02J3/26
The invention discloses a method for adjusting electric transmission line wire phase sequence arrangement according to current phase angles and amplitude values. The problem that the unbalance degree of three-phase currents of an existing electric transmission line is aggravated is solved. The method comprises the steps that according to the tower types adopted by a single transmission line and common-tower double transmission lines and the length of the actual lines, a calculation model is built through an electromagnetic transient calculation method, and simulation calculation is carried out. A complete-cycle Fourier data analysis program is compiled, Fourier complete-cycle filtering is carried out on current discrete data in the simulation calculation, fundamental current amplitude values and the phase angles of three phases A, B and C are filtered out, the current amplitude values and the phase angles of a fundamental positive sequence, a fundamental negative sequence and a fundamental zero sequence are respectively calculated, and the angel differences between the three phases A, B and C are calculated. The unbalance degree of current phase positions and the amplitude values is calculated through the amplitude value of the fundamental positive sequence and the angel differences between the three phases A, B and C. The calculated unbalance degree of the current phase positions and the amplitude values is controlled to be smaller than 5%. False operations of zero-sequence protection of buses and electric transmission lines of a transformer substation are avoided, and the safe operation of a power grid is guaranteed.
公开/授权文献:
- CN103795074B 根据电流相位角及幅值调整输电线路导线相序排列的方法 公开/授权日:2015-09-09
IPC结构图谱:
H | 电学 |
--H02 | 发电、变电或配电 |
----H02J | 供电或配电的电路装置或系统;电能存储系统 |
------H02J3/00 | 交流干线或交流配电网络的电路装置 |
--------H02J3/26 | .多相网络中消除或减少不对称的装置 |