
基本信息:
- 专利标题: 一种端部增设加劲肋的SCS钢管混凝土桥墩
- 专利标题(英):Sequence control system (SCS) concrete filled steel tube bridge pier with stiffening ribs added at bottom
- 申请号:CN201210580150.5 申请日:2012-12-27
- 公开(公告)号:CN102995555A 公开(公告)日:2013-03-27
- 发明人: 高小育 , 王旭 , 刘永健 , 杨光辉 , 傅梅珍 , 黄月超 , 刘鹏 , 刘玉娟 , 耿东升
- 申请人: 长安大学
- 申请人地址: 陕西省西安市南二环中段33号
- 专利权人: 长安大学
- 当前专利权人: 长安大学
- 当前专利权人地址: 陕西省西安市南二环中段33号
- 代理机构: 西安创知专利事务所
- 代理人: 谭文琰
- 主分类号: E01D19/02
- IPC分类号: E01D19/02 ; E01D101/26 ; E01D101/30
The invention discloses an SCS concrete filled steel tube bridge pier with stiffening ribs added at the bottom. The SCS concrete filled steel tube bridge pier comprises an outer steel tube, an inner steel tube, a top end stiffening structure, a bottom end stiffening structure and a concrete structure. The inner steel tube is sleeved inside the outer steel tube, the top end stiffening structure is distributed between the top end of the outer steel tube and the top end of the inner steel tube, the bottom end stiffening structure is distributed between the bottom end of the outer steel tube and the bottom end of the inner steel tube, the concrete structure is molded by pouring concrete filled in a cavity between the outer steel tube and the inner tube, the inner steel tube is a round steel tube, the outer steel tube and the inner steel tube are coaxially distributed, the top end stiffening structure comprises a plurality of longitudinal stiffening ribs one, and the bottom end stiffening structure comprises a plurality of channels of longitudinal stiffening ribs two. According to the SCS concrete filled steel tube bridge pier with stiffening ribs added at the bottom, the structure is simple, the design is reasonable, the construction is convenient, the construction cost is low, the mechanical property and the usage effect are good, and problems that the self weight is large, the connection property between the outer steel tube and the concrete inside the outer steel tube is poor, hooping functions of the outer steel tube on the concrete inside are small, upper and lower bottoms are easily bent, and the like in concrete filled steel tube bridge piers are solved.
公开/授权文献:
- CN102995555B 一种端部增设加劲肋的SCS钢管混凝土桥墩 公开/授权日:2015-06-24