![无条件稳性整装型深吃水浮式采油平台及其海上安装方法](/CN/2010/1/39/images/201010199308.jpg)
基本信息:
- 专利标题: 无条件稳性整装型深吃水浮式采油平台及其海上安装方法
- 专利标题(英):Unconditional stability equipped deep-draft floating production platform and offshore installation method thereof
- 申请号:CN201010199308.5 申请日:2010-06-09
- 公开(公告)号:CN101857072B 公开(公告)日:2012-09-26
- 发明人: 谢彬 , 谢文会 , 曾恒一 , 张威 , 王俊荣
- 申请人: 中国海洋石油总公司 , 中海石油研究中心
- 申请人地址: 北京市东城区朝阳门北大街25号
- 专利权人: 中国海洋石油总公司,中海石油研究中心
- 当前专利权人: 中国海洋石油集团有限公司,中海油研究总院有限责任公司
- 当前专利权人地址: 北京市东城区朝阳门北大街25号
- 代理机构: 北京纪凯知识产权代理有限公司
- 代理人: 徐宁; 关畅
- 主分类号: B63B35/44
- IPC分类号: B63B35/44 ; E21B43/01
The invention relates to an unconditional stability equipped deep-draft floating production platform and an offshore installation method thereof. The unconditional stability equipped deep-draft floating production platform is characterized by comprising an annular ballast tank at the bottom, a plurality of columns with small cross sections, an annular buoyancy tank at the middle part, a pluralityof columns with large cross sections, a drilling machine on the upper part and an oil gas processing module. The ballast tank adopts a permanent fixed ballast mode, and the tank is internally filled with weights to ensure that the buoyant center of the platform is higher than the gravity center; the columns with large and small cross sections are uniformly arranged on the buoyancy tank and the ballast tank respectively, and the lower parts thereof are respectively integrated with the buoyancy tank and the ballast tank; each column with a large cross section is provided with a central pore canal axially; a lower part in the central pore canal is provided with a chopping board connection structure with a groove; after the construction is completed, the columns with small cross sections are inserted into and pass through the central pore canals of the columns with large cross sections correspondingly; the platform is in a folding state; each column with a large cross section is provided with a group of mooring cables; the drilling machine and the oil gas processing module are installed in the construction area; the equipment is entirely transported to the installation site by adopting a dry haulage or wet haulage method and then is installed. The platform in the invention can be applied to deepwater oil and gas exploitation in the condition of threatening marine environment.
公开/授权文献:
- CN101857072A 无条件稳性整装型深吃水浮式采油平台及其海上安装方法 公开/授权日:2010-10-13
IPC结构图谱:
B | 作业;运输 |
--B63 | 船舶或其他水上船只;与船有关的设备 |
----B63B | 船舶或其他水上船只;船用设备 |
------B63B35/00 | 适合于专门用途的船舶或类似的浮动结构 |
--------B63B35/44 | .浮式建筑物,水上仓库,水上钻井平台或水上车间,例如载有油水分离设备的 |